| Better and easier
handling, management and storage of the slurry (both fractions).. |
 |
| Minimum Reduction
of 50% of the fields required for fertirrigation. |
- 90% TSS
reduction
- 80% reduction of the total mass load
- 95% TP reduction
- 50% NH4+ reduction |
| Smell elimination
in both fractions. |
| Minimal infrastructure. |
| 7 kW Power |
| 40 m2
Surface (6 x 6.6 m) |
| Closed cycle:
no waste- or by-products |
Economical
cost:
1.2 - 1.38 €/m3
0,01 /0,012 € /kg meat |
| Solid-liquid
utilization lines. Tertiary treatment. |
| Minimum infrastructure
necessities. |
| |