Design hypothesis
    

 


DESIGN HYPOTHESIS
PRODUCTIVE CAPACITY
Total Production
100 Tn/day
24.000 Tn/year
Produc. A
58 Tons/day
Produc. B
58 Tons/day
STORAGE OF PRIME MATTER
In bulk, between granaries
12.000 Tons
STORAGE OF FINAL PRODUCT
In bulk, in silos
1000 Tons Produc. A
200 Tons Produc. B
In big-bags
200 Tons Produc. A
1000 Tons Produc. B

 

ALTERNATIVES
ALTERNATIVE 1
DRY PROCESS FOR THE PRODUCTION OF A AND HUMID PROCESS FOR B.
ALTERNATIVE 2
DRY PROCESS FOR BOTH PRODUCTS.

 

. . .